Maintenance work on the carrier
7.11 Steering
03.11.2017
Maintenance manual 3 302 574 en 7 - 77
GMK3060
7.11.3 Pressure accumulator – checking the gas pressure
The gas pressure must be checked every 3,000 operating hours, but in any
case no less frequently than every 12 months.
The steering features integrated pressure
accumulators that contain nitrogen (1).
The filling pressure at 20 °C (68 °F) is:
• Have the filling pressure checked, and if nec-
essary corrected, by
Manitowoc Crane Care or
an authorised GROVE dealer or an author-
ised specialist workshop.
G
Risk of accidents due to incorrect inspection!
The gas pressure test must be carried out only by an authorised official
inspector of pressure tanks or under his/her supervision or instructions.
1 100 bar (14,504 psi)