Maintenance work on the superstructure
8.3 Hoists
8 - 14 3 302 574 en Maintenance manual
GMK3060
03.11.2017
8.3.6 Having a partial inspection carried out
Only suitably trained specialists should carry out a partial inspection of
– the multiple-disc brake,
– the plug connections between the hydraulic motor and the multiple-disk
brake,
– the plug connections between the multiple-disk bra
ke and transmission
unit
and be permitted to replace parts with signs of we
ar.
8.3.7 Having a general inspection carried out
H
When carrying out the general inspection of the hoists, also observe the
information contained in
Measures required for winch monitoring, p. 5 - 21.
The general inspection involves removing the transmission and sending it
to the manufacturer to be examined.
H
For transmissions that have undergone a general overhaul, an oil change
must be carried out after 200 and 1,000 operating hours;
à Run-in
regulations
, p. 4 - 1.