EasyManua.ls Logo

Manitowoc GROVE GMK 3060 - Page 236

Manitowoc GROVE GMK 3060
324 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance work on the superstructure
8.5 Slewing bearing
8 - 26 3 302 574 en Maintenance manual
GMK3060
03.11.2017
Checking the
outer ring
Divide the checking of the 52 screws into 13 working steps of 4 screws
each.
Between each of the 13 operation steps you need to rotate the turntable
to the next group of 4 bolts on the opposite side.
Switch the engine off after every rotation and secure the truck crane
against unauthorised use;
à p. 2 - 3.
Check the tightness of the first group of 4 adjoining screws (1);
à Torques, p. 8 - 25.
Once they have been checked, mark the bolts to avoid subsequent
confusion.
Remove the tool.
Start the engine and turn the turntable by 180° – the second group of
screws on the opposite side is now accessible.
Switch the engine off.
Check all other groups in the same way.
Checking the
inner ring
Divide the inspection of the 52 screws in 26 operation steps each with a
pair of screws on the opposite side.
Between each of the 26 operation steps you need to rotate the turntable
to the next pair of bolts on the opposite side.
Switch the engine off after every rotation and secure the truck crane
against unauthorised use;
à p. 2 - 3.
Check the tightness of the first pair of screws (1) and (2) on the opposite
side;
à Torques, p. 8 - 25.
Once they have been checked, mark the bolts to avoid subsequent
confusion.
Remove the tool.
Start the engine and turn the turntable by 90° – the second pair of screws
on the opposite side is now accessible.
Switch the engine off.
Check all the other pairs in the same way.

Table of Contents

Related product manuals