MLA System USER GUIDE
MLA System User Guide V2.1 403
The next step is to position the Control rack in a suitable position say at side of stage with the cable trunk next to it. Assuming
the cables have been loomed and positioned in the trunk as mentioned in previous chapters, the rack end of the main array loom
should be connected to the rack. The Tourmate mains connector should be connected to either the upper or lower Tourmate
outlet, the upper and lower U-Net connections can be made to the Merlin U-Net outlets. Note that when subs or side hangs are
added to a system you may disconnect one of the array network feeds and connected it to one of the parallel link connections
but while rigging a system it is good practice to connect both U-Net feeds to a live node so the network wiring can be checked at
all points. Mains can be connected and the breakers for the outlet being used turned on. If using a Mk 1 Master rack, you will
also need to turn on breakers 3 and 6 for the other outlet to power all control electronics.;-