EasyManua.ls Logo

Mercury 45 Jet 50-55 - Thermostat Cover Installation; Install Remaining Engine Components

Mercury 45 Jet 50-55
564 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
POWERHEAD - 4-3590-817643R1 DECEMBER 1996
Thermostat Cover Installation
1. Install thermostat components into cylinder block.
Torque bolts to 18 lb. ft. (24.5 N·m).
PE-51087
50/60 Models
PE-51087
55 Model
Install Remaining Engine
Components
Component/Assembly Section
Starter Motor 2B
Ignition Switch Box 2A*
Ignition Coil 2A*
Starter Solenoid 2B*
Voltage Regulator/Rectifier 2B*
Flywheel 2A
Stator Assembly 2A*
Trigger Assembly 2A*
Air Silencer 3A
Carburetor and Linkage 3A
Fuel Pump 3B
Fuel Enrichment Valve 3C
Shift Cable Latch Assembly 7A
Control Cable Anchor Bracket 7A
Warning Module 3D*
Oil Pump 3D
* Note: All ignition and electrical components can be re-
moved and installed as an assembly.
Powerhead Installation
1. Install lifting eye (p/n 91-90455) into flywheel a mini-
mum of 5 turns. Install powerhead to driveshaft hous-
ing. Slide shift slide on rail while lowering powerhead
on splines of drive shaft.
PE-51081

Table of Contents

Related product manuals