Connecting Gases TriStar II 3020
9-22 302-42828-01 - Dec 2012
2. Click the down arrow to the right of the Test field and select Clean and Verify Analysis Gas
Line Rev [n] Test Rev [n].
3. Click Report after analysis and select Preview as the destination. Click OK.
4. Click Start. From the View dropdown list, select either Operation, Instrument Log, or
Instrument Schematic. Refer to Sample Analysis, page 6-2.
5. A series of prompts display on the screen requiring operator response. The length of time a test
will run is also indicated on the screen.
6. A popup window indicates the test is complete. Click OK. The report displays on the screen.
On the report, the Leak Rate field on the Instrument to Regulator Shut-off Valve -1 report
should read Passed. A Passed reading indicates the gas line from the instrument to the regulator is
clean and leak-free.

Table of Contents

Other manuals for Micromeritics TriStar II 3020

Related product manuals