EasyManua.ls Logo

Micromeritics TriStar II 3020 - Page 257

Default Icon
439 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TriStar II 3020 Connecting Gases
302-42828-01 - Dec 2012 9-23
If the Leak Rate field indicates Failed, a leak is indicated between this connection. Check the
connections from the instrument to the gas regulator valve. Tighten as necessary, then run the test
again.
7. Click the Instrument to Gas Bottle Shut-off Valve - 2 tab to display its report.
On the report, the Leak Rate field should read Passed. A Passed reading indicates the gas line
from the instrument to the regulator is clean and leak-free.
If the Leak Rate field indicates Failed, a leak is indicated between this connection. Check the
connections from the regulator shut-off valve to the gas bottle shut-off valve. Tighten as necessary,
then run the test again.

Table of Contents

Other manuals for Micromeritics TriStar II 3020

Related product manuals