EasyManua.ls Logo

NEC express5800 A2010b - Page 235

NEC express5800 A2010b
491 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Installation and Connection
Chapter 2 Preparations
1. Make sure that the server is powered off and then disconnect the power cable or all interface cables from
the server. (If cable arm is mounted, remove it also.)
2. Make sure that proper earthquake-resistant construction is executed or stabilizers are mounted at front
bottom of rack to prevent from falling.
3. Remove the two screws at front of server.
4. Slowly pull out the server from rack until it is latched with clicks.
5. Slowly pull out the server from rails while unlocking the inner rails at both sides.
Important
Be careful not to get your fingers caught in the rails or lever.
6. Hold the server firmly and remove it from the rack.
Screws (2 places)
Express5800/A1040b, A2040b, A2020b, A2010b User's Guide
235

Table of Contents

Related product manuals