EasyManua.ls Logo

NEC express5800 A2010b - Turning on the Server

NEC express5800 A2010b
491 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Turning On the Server
Chapter 3 Setup
3. Turning On the Server
Pressing the SYSTEM POWER Switch at the front of the server turns on the server.
Turn on the server by using the following procedure.
Important
Do not power on the server before amber SYSTEM POWER LED is unlit.
Wait for at least 30 seconds before pressing the SYSTEM POWER switch
on the
server after turning off the server.
1. Turn on the peripheral devices and display unit.
Note
If the power cord is connected to power control system such as an Uninterruptible Power
Supply (UPS), make sure that the power control system is turned on.
2. Remove Front Bezel, if mounted.
3. Press SYSTEM POWER switch at the front of the server.
SYSTEM POWER LED is lit green and after a while, POST appears on the display.
Important
Do not connect or disconnect USB device while POST is running.
Tips
If Quiet Boot is Enabled on Boot menu of SETUP, the NEC logo is displayed instead
of details of POST.
The time before the logo is displayed is approximately
from 3 minutes to 17
minutes. This is changed depending on the server configuration.
When "Reset Param BIOS" is enabled on [Remote Access] tab of the Web Console or
System BIOS settings are changed
on [Configuration] tab of the Web Console, the
time before the logo is displayed may become longer.
The self-diagnostic program (POST) runs and diagnoses the hardware. For details, refer to Chapter 3
(3.1 POST).
SYSTEM POWER switch SYSTEM POWER LED
Express5800/A1040b, A2040b, A2020b, A2010b User's Guide
255

Table of Contents

Related product manuals