You can perform power control of the server as follows.
Power ON
Power OFF immediate
Soft Shutdown
Hard Reset
Force Dump
Power Cycle
Important
Performing these operations while the operating system is running may cause
the loss of data in the server.
Specify the IP address of EXPRESSSCOPE Engine SP3 on master BMC for
"IP_ADDRESS", and login user name and login password
for ”USERNAME/PASSWORD” in the example.
Specify http or https for "PROTOCOL" in the example.
Do not perform any operation on WS-
Management while any of the following is
running on Web console.
Tab
Menu screen
Buttons on dialog
Remote
Access
Power Control All buttons
System Operation
All buttons
Configuration IPv4 Property (Master) [Apply] button on Edit screen
IPv6 Property (Master)
[Apply] button on Edit screen
Service (Master) [Apply] button on Edit screen
Backup / Restore
[Backup], [Restore]
Update BMC [Update]
BIOS
Hardware Log [Download BMC Dump]
Device Online / Offline
[Apply] button on Edit screen
Diagnosis [Execute]
Tips
To perform power control with WS-Management, an Operator privilege or an Administrator
privilege is required.
Express5800/A1040b, A2040b, A2020b, A2010b User's Guide
448

Table of Contents

Related product manuals