EasyManua.ls Logo

NEC express5800 A2010b - Page 246

NEC express5800 A2010b
491 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Installation and Connection
Chapter 2 Preparations
4. Secure the handle of power supply unit and power cable with repeat tie. Fasten the cable tie so that it
firmly engages with boundary between the power cable connector and cable harness.
5. Turn the AC power on.
a) If PDU (Power Distribution Unit) is used, turn on the switch of PDU.
b) If UPS (Uninterruptible Power Supply) is used, turn on UPS.
Other than above, turn on the breaker of AC power supply, it it is off.
6. Make sure that Power Unit LED blinks green.
Handle of power supply unit
Repeat tie
Confirm that the cable tie is firmly engaged with this
portion so that the power cable would not be
disconnected.
Express5800/A1040b, A2040b, A2020b, A2010b User's Guide
246

Table of Contents

Related product manuals