EasyManua.ls Logo

NEC SL1100 - Table 4-1 Status Leds; Figure 4-18 LOAD Button (S1) Location; Figure 4-19 Removing the CF Card

NEC SL1100
206 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. Push in and hold the LOAD button (S1 on the CPU card).
Sub-Cover
Tab
< Front view >
S1
LOAD
CPU card
Tab
Figure 4-18 LOAD Button (S1) Location
6. Turn the system power on.
7. Continue holding the LOAD button (S1) for approximately 10 seconds or until Status LED (D5)
starts flashing red.
8. Release the LOAD button (S1).
9. Wait until the Status LEDs (D2 to D5) on the CPU card has the following indications
(approximately two minutes).
Table 4-1 Status LEDs
LED No. Indication Remarks
D2 Flashing Red
D3 Flashing Red
D4 Flashing Red
D5 Off
10. Turn the power off and remove the CF card from the CF slot on VMDB.
CPU card
CF Slot (CN2)
CF card
VMDB
Figure 4-19 Removing the CF card
11. Replace the Main-Cover and Sub-Cover.
12. Turn the system power back on.
SL1100
ISSUE 5.0
4-12 Maintenance

Table of Contents

Other manuals for NEC SL1100

Related product manuals