7. Installation
This section describes the procedures to be followed when unpacking and installing the unit.
7-1. Verifying The Shipping Container Contents
When unpacking the unit, be sure to verify that all the components are present.
(1) VS-12PB
(2) ABSOCODER Sensor
(3) Sensor Cable
3S-RBT-� or 4P-S-� or 4P-RBT-�
( Depending on Sensor type )
①
②
One plug-in
terminal board
③
Two keys
(for key switch)
④
⑤
Two BCD input/output connectors
(Provided with VS-12PB-[ ]D Model)