Pitco SSHLV (ROV) Gas Fryers
7. Install stuffing block in tank using high
temperature food grade thread sealer.
Install white housing on terminals. Tighten
ferrule nut on stuffing block. Plug
connector back in to entrance box
(J7/J107). Tighten screws on probe holder.
L22-392 R1 28