Moving your SendPro C-Series meter
If you have to move your SendPrC-Series meter follow these steps and precautions to move it safely.
These apply whether you are moving the meter across the room or to a new facility.
1. If you have a scale, remove it from the top of the meter.
2. Remove the moistener assembly. Follow the steps in Cleaning the moistener brush and wick
assembly. Once you have removed and cleaned the assembly place it in a zip-top bag for transport
to prevent any remaining fluid from leaking.
3. Remove the ink cartridge. Follow the steps in Installing the ink cartridge Once you get the ink
cartridge out, place it in a zip-top bag.
4. Close the top cover.
5. Remove any USB cables and optional peripherals such as a printer or scanner and pack them with
the meter.
6. Unplug the power cable and pack it with the meter.
7. Once in the new location, re-install any USB cables and peripherals.
8. Plug the power cord into the meter and power outlet.
9. Re-install the ink cartridge. Follow the steps in Installing the ink cartridge.
10. Re-install the moistener assembly. Follow the steps in Cleaning the moistener brush and wick