EasyManua.ls Logo

R&S NRP2 - Emc; Setting up the Meter; Unpacking the Meter

R&S NRP2
437 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Putting into Operation
R&S
®
NRP2
8User Manual 1173.9157.02 ─ 03
1.2 EMC
EMI impact on measurement results
To prevent EMI, the meter must always be installed to meet the relevant EMC standards.
Never operate the instrument with its enclosure removed. Only use shielded signal and
control cables that meet the relevant EMC standards.
1.3 Unpacking the meter
When you have removed the meter from its packing, check that nothing is missing using
the delivery note and the accessory lists.
If there is any damage, contact the carrier. Keep all the packing to support any claims for
compensation.
Retain the original packing material. If the instrument needs to be transported or shipped
at a later date, you can use the material to prevent control elements and connectors from
being damaged.
1.4 Setting up the meter
The R&S NRP2 is designed for use under laboratory conditions, either on a bench top or
in a rack.
1.4.1 Carrying handle
If the R&S NRP2 is not installed in a rack, it should be set up so that the viewing angle
for the display is optimal. The carrying handle can be locked in a variety of positions to
act as a stand.
To adjust the handle, pull the two side-pieces of the handle outwards so that the handle
can be rotated.
The handle locks at angles which are multiples of 60°.
EMC

Table of Contents

Related product manuals