Technical Bulletin PAGE: 8/11
Reissued:27-Mar-14
Model: Finisher SR4090/Booklet Finisher SR4100
16. Connect the finisher connector [A] to the machine.
17. Close the front door of the finisher.
18. Install the upper output tray [A] ( x 1; M3 x 8).
19. Only for D704, install the lower output tray [A].
20. Turn on the main power switch of the machine.
21. Check the finisher operation.