EasyManuals Logo

Rotax 914 series Installation Manual

Rotax 914 series
142 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #140 background imageLoading...
Page #140 background image
page 140
July 01/2008
Effectivity: 914 Series
Edition 2 / Rev. 0
d04283
INSTALLATION MANUAL
BRP-Rotax
- Check exhaust system for security and free of blockage
- Preheat engine in cold weather.
Conduct test run:
See Operators Manual 914 section 10.3
Verification of the throttle lever detent for max. continuous power:
Performance check in accordance with Operator's Manual.
If nominal performance won't be reached or is in excess of, examination of the installation and
engine will be necessary. Consult Maintenance Manual 914.
CAUTION: Don't conduct any test flights before all faults have been traced and found.
- Make an entry of the details and test results into the engine log book.

Table of Contents

Other manuals for Rotax 914 series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rotax 914 series and is the answer not in the manual?

Rotax 914 series Specifications

General IconGeneral
Bore79.5 mm
Stroke61 mm
Compression Ratio9.0:1
Cooling SystemLiquid-cooled cylinder heads, air-cooled cylinders
Redline5800 rpm
Engine Type4-cylinder, 4-stroke
Fuel TypeAvgas 100LL
Oil SystemDry sump
Fuel Systemfuel injection
TBO (Time Between Overhauls)2000 hours
Displacement1.211 liters (1211 cc)
Power Output84.6 kW (115 hp) at 5, 800 rpm

Related product manuals