EasyManua.ls Logo

Seca 525 - Making the Device Operational; 4.1 Scope of Delivery and Power Supply

Seca 525
86 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Making the device operational • 21
English
4. MAKING THE DEVICE OPERATIONAL
4.1 Scope of delivery
4.2 Establishing power supply
1. Plug the device connector of the power supply cable into the connecting
socket of the device.
2. Plug the power supply connector into a power supply socket.
Scope of delivery
Establishing power supply
Suspending measuring mat in storage compartment
Setting the date and time
Charging rechargeable batteries
Configuring the device
No. Component Pcs.
a
Measuring mat with rechargeable battery and electrode
cables
1
b
Monitor with rechargeable battery 1
c
Power supply cable (country-specific) 1-3
d
"Quick Start" brief instructions, printed 1
e
DVD with seca analytics 115 PC software and license for
one permanent workstation
1
f
Push-button electrodes for affixing to patient, pack of 30 2
seca 115
QUICK START
seca
525
a b
c
d
e
f

Table of Contents

Other manuals for Seca 525

Related product manuals