6.0 Testing UUKL Devices
The goal of UUKL is prevent smoke from entering other floors (or zones) by pressurizing them
to evacuate the smoke from the smoked zone.
This chapter describes how to create an interval for testing UUKL devices.
6.1 Configuring a UUKL Smoke Control Test Interval
1. Create an interval for your testing time and cycle. Figure 23 shows an interval called
UUKL Test from 11:09 am to 11:12 am every Tuesday. See section 8.2 on page 64 for
more information.
Figure 23 Interval for UUKL testing
2. Select the input zone for the UUKL devices.
3. Click the Advanced Logic tab at the bottom, and then click Edit.
The Advanced Logic Editor appears.
4. In the Advanced Logic Editor, select the interval that you just created, and then click the
> button to move the interval to the Equation box.
The equation should look like this:
**-**-**-IT-010
Attention: You should be familiar with advanced logic before following the
instructions in this chapter. See chapter 5 on page 36.
!

Table of Contents

Other manuals for Secutron MMX-2009-12NDS

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Secutron MMX-2009-12NDS and is the answer not in the manual?

Secutron MMX-2009-12NDS Specifications

General IconGeneral
BrandSecutron
ModelMMX-2009-12NDS
CategoryControl Panel
LanguageEnglish

Related product manuals