3-17SJ62 Manual
C53000-G1140-C121-1
Initial Inspections 3
This section describes the first steps that should be taken upon receiving the
SIPROTEC
®
4 7SJ62.
Unpacking and packing is explained.
Visual and electrical checks that are appropriate for initial inspection are discussed.
The electrical tests include navigating through the operating menus of the device us-
ing the operator control panel on the front of the device, and the operator control win-
dows in DIGSI
®
4. For personnel inexperienced with the 7SJ62, these checks also
provide a quick and simple method for understanding the operation of the control pan-
el and DIGSI
®
4. The electrical tests can be done without measuring quantities being
applied.
Observations relevant to long-term storage of the device are noted.
3.1 Unpacking and Packing 3-2
3.2 Inspections Upon Receipt 3-3
3.3 User Interface 3-5
3.4 Storage 3-14
www . ElectricalPartManuals . com