EasyManua.ls Logo

Siemens TIM 4R-IE DNP3 - Page 101

Siemens TIM 4R-IE DNP3
354 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Configuration in STEP 7
5.6 Configuring networks and network nodes in STEP 7 / NetPro
TIM DNP3
System Manual, 06/2014, C79000-G8976-C253-03
101
The
Date created
is displayed.
The
Date of the last modification
is displayed.
In the
Comment
input box, you can enter comments of up to 254 characters.
5.6.3
Generating network attachments
To network a project, the communication-compliant modules (for example CPU or TIM) must
be connected to suitable networks. The modules in the station icons in the project window of
the network configuration include interface and network node icons displayed in different
colors according to the network type.
Figure 5-14 Station with two network nodes, one of which is networked
Note
After changing connections, even if these are re
-established again later, the SINAUT
configuration tool with the
connection configuration
and the
subscriber administration
must b
e
called.
Printing network information
The project can be printed and documented as a graphic or as text using the
Network / Print
menu.

Table of Contents

Related product manuals