EasyManua.ls Logo

Stulz EC Tower ECD 91 - Page 86

Stulz EC Tower ECD 91
206 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
86 EN/01.2019/G22  © STULZ GmbH – all rights reserved
ec tower technical manual
Setting the air humidity setpoint
9. 
 
10. 
11. Wait until the steam humidifier has filled with water.
12. 
- To do this, open the door of junction box 1 using the supplied triangular socket wrench.
 S70) on the CPY controller to the right (M26 MAN. DRAIN).
13. During blowdown, check the following components for leaks:
 
 
 
14. During blowdown, check that the condensate pump is functioning correctly.
15. S70) on the CPY controller to the left (M24 ON/OFF).
- The steam humidifier goes into normal operation.
16. Close the door of junction box 1 using the supplied triangular socket wrench.

Table of Contents

Related product manuals