EasyManua.ls Logo

Suzuki GSX1300R - Page 300

Suzuki GSX1300R
663 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1D-79 Engine Mechanical:
Install the balancer cover.
NOTE
Apply a small quantity of thread lock to the
balancer cover bolt and tighten it to the
specified torque.
: Thread lock cement 99000–32110
(THREAD LOCK CEMENT SUPER 1322 or
equivalent)
Tightening torque
Balancer cover bolt (c): 10 N·m (1.0 kgf-m, 7.0 lb-
ft)
Remove the starter clutch cover, starter clutch and
cam chain drive sprocket.
Breather Pipe
Install the breather pipe to the crankcase.
NOTE
Apply a small quantity of thread lock to the
breather pipe bolt and tighten it to the
specified torque.
: Thread lock cement 99000–32110
(THREAD LOCK CEMENT SUPER 1322 or
equivalent)
Tightening torque
Breather pipe bolt (a): 10 N·m (1.0 kgf-m, 7.0 lb-ft)
Oil Strainer
Install a new O-ring.
NOTE
Apply grease to the O-ring.
: Grease 99000–25010 (SUZUKI SUPER
GREASE A or equivalent)
CAUTION
!
Use the new O-ring to prevent oil leakage.
Install the oil strainer.
NOTE
Apply a small quantity of thread lock to the
strainer bolts and tighten it to the specified
torque.
: Thread lock cement 99000–32110
(THREAD LOCK CEMENT SUPER 1322 or
equivalent)
Tightening torque
Oil strainer bolt (a): 10 N·m (1.0 kgf-m, 7.0 lb-ft)
(c)
I815H1140061-01
(a)
I823H1140228-02
I823H1140229-01
(a)
I815H1140111-02

Table of Contents

Other manuals for Suzuki GSX1300R

Related product manuals