EasyManuals Logo

Tektronix GeoProbe G10 Installation Guide

Tektronix GeoProbe G10
168 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #108 background imageLoading...
Page #108 background image
G10 Installation Guide 7.13.2 108
C
Rev. 005-140228
G10 MAINTENANCE PROCEDURES
This section contains the following information:
Field Replaceable Units
Removing and Replacing a PEM
Replacing the Fan Tray
Replacing G10 Chassis Air Filters
G10 Blade Removal/Replacement Procedures
Replacing G10 Shelf Managers (SHMMs)
Serial Over LAN (SOL) Support
G10 Probe and Array Start Up/Shut Down Sequence
Field Replaceable Units
The following tables lists the Field Replaceable Units (FRUs) for the G10 and storage array.
Chassis
3U DC Chassis with Shelf Manager
G10 SHMMs (replaced in pairs)
G10 DC Power Entry Module (PEM)
AC Power Entry Module (PEM)
G10 Fan Tray (Front)
G10 Fan Tray (Rear)
G10 Air Filters
Blades and RTMs
IIC100 8x 1GB Blade set includes the following:
AMC Carrier Blade CAB100
LPC100 AMC
FPC100 AMC
SRM100 RTM
Tektronix Communications | For Licensed Users | Unauthorized Duplication and Distribution Prohibited

Table of Contents

Other manuals for Tektronix GeoProbe G10

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Tektronix GeoProbe G10 and is the answer not in the manual?

Tektronix GeoProbe G10 Specifications

General IconGeneral
BrandTektronix
ModelGeoProbe G10
CategoryAccessories
LanguageEnglish