EasyManuals Logo

Tektronix GeoProbe G10 Installation Guide

Tektronix GeoProbe G10
168 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #164 background imageLoading...
Page #164 background image
G10 Installation Guide 7.13.2 164
User Documentation
G10 NEBS
Requirements
OVERVIEW
This document provides information necessary for ensuring the G10 probes and storage
enclosures comply with Network Equipment Building Systems (NEBS) requirements.
G10 PROBE SIGNAL PORT REQUIREMENTS
When installing the G10 probe signalling ports, you must comply with the following NEBS
requirements:
To comply with the Telcordia GR-1089 NEBS standard for electromagnetic compatibility and
safety, connect the signal ports only to intra-building or unexposed wiring or cable that is
shielded and grounded at both ends. The intra-building port(s) of the equipment or
subassembly must not be metallically connected to interfaces that connect to the OSP or its
wiring. These interfaces are designed for use as intra-building interfaces only (Type 2 or
Type 4 ports as described in GR-1089-CORE, Issue 6) and require isolation from the
exposed OSP cabling. The addition of Primary Protectors is not sufficient protection in order
to connect these interfaces metallically to OSP wiring.
Tektronix Communications | For Licensed Users | Unauthorized Duplication and Distribution Prohibited

Table of Contents

Other manuals for Tektronix GeoProbe G10

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Tektronix GeoProbe G10 and is the answer not in the manual?

Tektronix GeoProbe G10 Specifications

General IconGeneral
BrandTektronix
ModelGeoProbe G10
CategoryAccessories
LanguageEnglish