G10 New Installation and Upgrade Workflows
Rev. 005-140228
4. Restore original probe cabling; refer to Chapter 3 for reference.
5. Run Probe Setup on G10 terminal [or Web Config GUI (see Chapter 4 for
details)] to confirm the probe IPs are setup correctly and to reintegrate the
form
er
IAP blade and check the disk controllers connection.
6. Check the probe configuration on Probe Management GUI in Iris OAM.
7. Reconfigure the disk array by reapplying the same profile to the probe; ALL call
records stored on
the probe w
ill be lost.
8. Verify that all G10 applications are running.
9. Verify traffic on ISA and IPA.
IIC100 Rollback Option
Perform the following to rollback to the previously configured IIC/RTM.
Step Action
1. Shut down the probe (halt the system).
2. Remove cabling from the IIC200 blade and SRM200 RTM and remove them
from the
chassis. Non-eHRPD configurations: Only remove the IIC200 blade;
do not remove cabling or TRM100 RTM.
3. Reinsert the SRM100 RTM first, and then reinsert the IIC100 blade.
4. Restore original probe cabling; refer to Chapter 3 fo
r reference.
5.
Run Probe Setup on G10 terminal [or Web Config GUI (see Chapter 4 for
details)] to confirm the probe IPs are setup correctly and to reintegrate the
IIC10
0
blade and check the disk controllers connection.
6. Check the probe configuration on Probe Management GUI in Iris OAM.
7. Reconfigure the physical ports on Probe Ma
na
gement GUI in Iris Admin and re-
provision links.
8. Reconfigure the disk array by reapplying the same profile to the probe; ALL call
records stored on
the probe w
ill be lost.
9. Verify that all G10 applications are running.
10. Verify traffic on ISA and IPA.