MOWER DECK
7-6 36” & 40” Toro GrandStand Service Manual
7
Spindle Assembly Installation
8. Removethesixthreadformingscrewssecuringthe
spindle assembly to the deck (Fig. 563).
Toservicethespindleassembly,referto“Spindle
Service”onpage7-8.
1. Secure the spindle assembly to the deck using six
thread forming screws (Fig. 564).
Fig. 563 DSCN-3153a
Fig. 564 DSCN-3153a
2. Secure the thread forming screws with nuts (Fig.
565).
Fig. 565 DSCN-3152a