Commissioning the device
Hans Turck GmbH & Co. KG | T +49 208 4952-0 | F +49 208 4952-264 | more@turck.com | www.turck.com
40
6.1.3 Operation of the device at the PLC
h Configure the device in the PLC
Device configuration in TIA Portal, see chapter 7
, Configuring with Turck Safety Configura-
tor.
h Load parameterization and configuration data via the PLC into the device.
h Execute a functional test.
h Check if the device works according to the configuration (see chapter 7
, Configuring with
Turck Safety Configurator
) and if all safety functions react as experted.