Chapter 4 _______________________________________________________________ Installation
VAISALA _______________________________________________________________________ 69
- Connect the AC voltage to the power supply of the interface
unit.
11. Finalize the receiver installation:
- Install the receiver measurement unit.
- Mount the optional LT31OBS.
- Connect the optional LT31OBS.
- Make intercommunication connections to the transmitter.
- Connect the communication line to the host system.
- Connect the AC voltage to the power supply of the interface
unit.
12. Perform startup tests, final alignment, and calibration for the LT31
system.