D7x11 Series II Navigator Directional Drill Receiving and Delivery Report i
Receiving and Delivery Report
DEALER PREP
Check or perform the following:
___ Check for shipping damage or shortage.
___ Check that work area cones are supplied with the machine.
___ Check that certificates for electrically insulated gloves (1 pair) and boots (2 pairs) are supplied with the machine.
___ Check machine for loose bolts.
___ Check installation and condition of all shields.
___ Check tracks for proper tension.
___ Check condition of all safety signs.
___ Check Strike Alert system.
___ Check that the Operator Presence system functions.
___ Check that red safety stop bar functions.
___ Check Remote Lockout system.
___ Check oil in rotation gearbox.
___ Check operation of fluid flow systems (Off/On, Full Flow, Wash Wand).
___ Check operation of locator system if supplied.
Engine
___ Check engine oil level.
___ Check condition of air cleaner.
___ Check air intake clamps.
___ Check battery charge and electrolyte level.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Vermeer Navigator D7 11 Series and is the answer not in the manual?

Vermeer Navigator D7 11 Series Specifications

General IconGeneral
BrandVermeer
ModelNavigator D7 11 Series
CategoryDrill
LanguageEnglish

Related product manuals