D7x11 Series II Navigator Directional Drill
O
Obstructions - Investigate, 50-22
Operating the Portable Breakout System, 55-10
Operation, 50-1
Operator Presence System, 40-12
Operator Presence/Seat Controls, 20-12
Operator Qualifications, 40-1
Overview, 30-1
P
Personal Protection, 40-4
Pilot Bore, 50-13
Planning the Bore, 40-15
Plugged Drill Rod, 50-23
Portable Breakout Controls, 55-5
Portable Breakout System Chain - Periodic Inspection, 55-15
Portable Breakout System Intended Use, 55-4
Portable Breakout System Setup, 55-7
Portable Breakout System Tong Chain - Adjust, 55-14
Portable Breakout System Tongs - Remove, 55-14
Portable Breakout System Torque Values, 55-12
Portable Breakout System True Torque, 55-13
Portable Breakout System, 55-4
Power Line Locator System, 40-14
Power ON/OFF Button, 30-3
Power Vise Controls, 20-14
Power Vise Operating Guidelines, 30-32
Power Vise Operation, 30-32
Power Vise Use When Adding Rods to Drill String, 30-33
Power Vise Use When Removing Rods from Drill String, 30-33
Power Vises - Clean, 50-35
Power Vises, 30-32
Preparation, 40-1
Preparing for Transport, 50-4
Preparing Personnel, 40-1
Preparing the Machine, 40-12
Preparing the Work Area, 40-14
Pullback - Start, 50-28
Pullback Tool - Install, 50-25
Pullback, 50-27
Push-Through Method of Adding Drill Rod for Pre-Reaming, 50-32
PVC Pipe Pulling (Option), 30-20
Q
R
Rack/Stabilizer Control - Transport Station, 20-11
Radio Channel - Change, 30-9
Radio Communication Requirements, 40-2
Radio Communication to Resume Drilling Operation, 40-3
Radio Communication to Stop Drilling Operation, 40-3
Range - Test, 40-12
Read Overview Section, 50-13
Reamer - Connect with Hex Collar Connection, 30-25
Reamer - Connect with Threaded Connection, 30-24
Reamer Carrier - Install/Remove, 30-22
Reamer Carrier - Intended Use, 30-21
Reamer Carrier - Lift, 30-23
Reamer Carrier Components, 30-22
Reamer Carrier Styles, 30-21
Reamer Carrier Use, 50-24
Reamer Carrier Wear Pads - Replace, 30-25
Reamer Installation, 30-21