EasyManua.ls Logo

Wacker Neuson WL 50

Wacker Neuson WL 50
254 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATING AND OPERATION
90
Work operation5.4
Before starting to work with the loader:
Survey the work area to determine if people,
vehicles and obstacles are in the immediate
work area. Do not start work until the work area
is clear.
Constantly survey the area during working op-
eration to avoid collision with people, vehicles
and obstacles that may inadvertently enter the
loader work area.
Verify that all controls are working correctly and
the indicator lights are functioning. Move the
lift arm and attachment hydraulics to assure
smooth control response.
Jerky, spongy or delayed control response may
indicate that air has entered the hydraulic sys-
tem. Cycle the hydraulic system a few times. If
the controls become smooth, the air has been
eliminated from the system. If the problem per-
sists, do not operate the machine in this condi-
tion. Advise the supervisor and have a techni-
cian determine the source of air entrainment.
Inspect attachments to conrm they are in ser-
viceable condition and are properly connected
to the loader arms.
In the event of power loss (failure of the engine and/
or driving or working hydraulics), lower the loader lift
arms to the ground immediately and relieve the con-
trol circuits and hydraulic lines of pressure. Read
section 7 page 133 »Lowering loader arms«.

Table of Contents

Related product manuals