SERVICING AND INSPECTION
150
Inspection after 500 operating hours
Tasks to be performed (check) 500 hours inspection
Check transmission, engine and hydraulic system for leaks
Check the hydraulics, water and hydraulic uid radiators for dirt
Check the coolant level and antifreeze
Check the tension and condition of the V-belt
Check the routing of hoses and pipes
Check the piston rods for the hydraulic cylinders
Check the air lter hose
Check routing of bowden cables and electrical wiring
Retighten all the fasteners. Observe in particular the engine suspension, axle mounting and drive shaft
Check the engine suspension‘s rubber pad
Maintenance and inspection personnel must have
specialized knowledge of servicing and inspection
work on the loader.
Follow the Operator’s Manual for the engine.
This inspection is performed once after the rst
500 operating hours. Should the loader not reach
500 operating hours during the rst year of opera-
tion, perform this inspection once 12 months after
starting up the loader.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Wacker Neuson WL 50 and is the answer not in the manual?

Wacker Neuson WL 50 Specifications

General IconGeneral
BrandWacker Neuson
ModelWL 50
CategoryCompact Loader
LanguageEnglish

Related product manuals