EasyManua.ls Logo

Wacker Neuson WL 50

Wacker Neuson WL 50
254 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SERVICING AND INSPECTION
221
WL50
Loader storage10.9
The specied measures refer to shutting down and re-start-
ing the loader over longer periods of time.
Follow the Operator’s Manual for the engine.
Shutting down the loader
Park the loader as described in
1.
section 9, page 137
»Securing the loader«.
Engage the articulated frame lock
2.
(Ref. Section 6.2,
page 126).
Raise the loader so that the tires no longer touch the
3.
ground.
Release the parking brake.4.
Lower the loader lift arms and attachment to the
5.
ground.
Relieve residual hydraulic pressure, ref.
6.
Section 8, page
134 »Relieving residual pressure in the hydraulic sys-
tem«. Move all hydraulic controls to the neutral posi-
tion.
Spray bare metal parts of the loader (e.g.: the piston
7.
rods of the hydraulic cylinders if they are not retracted)
with an anti-corrosion agent.
Preserve the engine.8.
Note:
Before beginning the shutdown procedures, drive the
Wheel Loader to its storage location.

Table of Contents

Related product manuals