EasyManua.ls Logo

Wacker Neuson WL 50

Wacker Neuson WL 50
254 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATING AND OPERATION
91
WL50
Each time before starting work
Examine the loader for visible defects prior to each work
shift.
Check the functioning of the operating equipment.
Check the functioning of the brakes and warning de-
vices.
Report any defects to the supervisor and, when changing
shifts, to the operator taking your place.
Perform the checks described in sections
5.1 (page 58)
and 5.2.5 (page 80).

Table of Contents

Related product manuals