Commissioning inoLab
®
Multi 9620 IDS
12 ba77173e04 12/2017
3 Commissioning
3.1 Scope of delivery
MeterMulti 9620 IDS
USB cable (A plug on mini B plug)
Power pack
Stand with stand base
Short instructions
Comprehensive operating manual (4 languages)
CD-ROM
3.2 Power supply
The Multi 9620 IDS is supplied with power in the following ways:
Mains operation with the supplied power pack
In the case of power failure:
The system clock is operated via a buffer battery (see section 14.1.2
E
XCHANGING THE BATTERY, page 123).
3.3 Initial commissioning
Perform the following activities:
Connect the power pack
(see section 3.3.1 C
ONNECTING THE POWER PACK, page 13)
Switch on the meter (see section 4.2 S
WITCHING ON THE METER, page 19)
Set the date and time (see section 4.5.5 E
XAMPLE 2 ON NAVIGATION: SETTING
THE DATE AND TIME, page 25)
Mount the stand
(see operating manual of the stand)