EasyManua.ls Logo

ABB ACS580-07 - Option Slot 1 (Fieldbus Adapter Modules); Wiring the Optional Modules

ABB ACS580-07
288 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Option slot 1 (fieldbus adapter modules)
1. Put the module carefully into its position on the control unit.
2. Tighten the mounting screw (CHASSIS) to 0.8 N·m. The screw tightens the connections
and grounds the module. It is necessary for fulfilling the EMC requirements and for
correct operation of the module.
1
2
Wiring the optional modules
See the appropriate optional module manual or for I/O options chapter Optional I/O extension
modules for specific installation and wiring instructions.
Electrical installation 113
11

Table of Contents

Other manuals for ABB ACS580-07

Related product manuals