Verify the Lithium Battery Status is OK with a green bar, see Figure 8-6: Station Setup.
If the status is Low Voltage or Not Connected, then the field background color is red.
Change settings in the Station Setup tab as needed. Leave PCCU open on the Station Setup
tab.
The factory configuration has a default date and time format displayed on the LCD.
Change the default format to preferred settings:
On the Station Setup tab, scroll down to the LCD Display Date/Time Format. See the figure
below.
Figure 8-7: Station Setup detail
Select the preferred Date/Time Format (mmddyy or yymmdd).
Select the preferred Date Separator (slash, dash, or period).
Select the preferred Time Separator (colon or period).
Click Send to save the station settings.
The XFC
G5
or XRC
G5
shipped with standard configuration and the gas orifice measurement application
configured by default. This procedure describes the setup of that flow measurement application (single
tube). To set up additional tubes or different measurement application types, refer to the online help
topics in PCCU. Click Help on the specific application screens for application-specific topics.
Set up the gas orifice flow measurement application:
On the PCCU navigation tree, click Flow Measurement > Adv Setup.