EasyManua.ls Logo

Agilent Technologies 6500 Series - To Reinstall the High Pressure Ion Funnel Process

Agilent Technologies 6500 Series
154 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
138 Agilent 6500 Series Q-TOF LC/MS Maintenance Guide
2Maintenance
To reinstall the high pressure ion funnel process
To reinstall the high pressure ion funnel process
Parts Needed Needle nose pliers
Torx T-20 wrench
1 Install the ion funnel into the housing and secure with the two captive
screws.
2 Connect the five internal wires to the feed throughs:
Connect the two orange wires to the top connectors.
Connect the black wire to the bottom-rear connector.
Connect the red wire to the front-rear connector.
Connect the white wire to the bottom-most connector.
See Figure 75.
3 Install the desolvation assembly with two captive M4 screws.
4 Install the ESI with Agilent Jet Stream Technology.
5 Pump down the instrument.
Figure 75 Internal wires to the feed through.
Rear
Front
Orange Orange
White
RedBlack

Table of Contents

Related product manuals