EasyManuals Logo

Agilent Technologies 6500 Series User Manual

Agilent Technologies 6500 Series
154 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #138 background imageLoading...
Page #138 background image
138 Agilent 6500 Series Q-TOF LC/MS Maintenance Guide
2Maintenance
To reinstall the high pressure ion funnel process
To reinstall the high pressure ion funnel process
Parts Needed Needle nose pliers
Torx T-20 wrench
1 Install the ion funnel into the housing and secure with the two captive
screws.
2 Connect the five internal wires to the feed throughs:
Connect the two orange wires to the top connectors.
Connect the black wire to the bottom-rear connector.
Connect the red wire to the front-rear connector.
Connect the white wire to the bottom-most connector.
See Figure 75.
3 Install the desolvation assembly with two captive M4 screws.
4 Install the ESI with Agilent Jet Stream Technology.
5 Pump down the instrument.
Figure 75 Internal wires to the feed through.
Rear
Front
Orange Orange
White
RedBlack

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Agilent Technologies 6500 Series and is the answer not in the manual?

Agilent Technologies 6500 Series Specifications

General IconGeneral
BrandAgilent Technologies
Model6500 Series
CategoryLaboratory Equipment
LanguageEnglish

Related product manuals