EasyManua.ls Logo

Amada WELD CHECKER MM-400A - 5. Operation Flow

Amada WELD CHECKER MM-400A
328 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MM-400A
5. Operation Flow
5-1
5. Operation Flow
The operation flow is shown below.
Device connection
......: Option
(Refer to (1) in Chapter 6)
Install the MM-400A
Startup the MM-400A
(Refer to (1) in Chapter 7)
Print measurement results
(Refer to (2) in Chapter 8)
Shut down the MM-400A
Using recorded data
Perform measurement
Current (current
flow time)
measurement
(Refer to (1) in
Chapter 9)
Voltage
measurement
(Refer to (1) in
Chapter 9)
Displacement
measurement
*1
(Refer to (2) in
Chapter 9)
Force
measurement
*1
(Refer to (3) in
Chapter 9)
(Refer to (3) in Chapter 7)
(Refer to Chapter 12)
Connect measurement devices to the MM-400A
Displacement
sensor
(Refer to (2) b,
Chapter 6)
Displacement
measurement
*1
Toroidal coil
Current
measurement
(Refer to (2) a,
Chapter 6)
Voltage
measurement
Voltage
detection
cable
(Refer to (2) a,
Chapter 6)
Force
sensor
or
Force
measurement
*1
Current/force
sensor
(Refer to (2) c,
Chapter 6)
(Refer to (2) c,
Chapter 6)
Connect with other
devices
Sequencer
PC
etc.
Setup the system and conditions
(Refer to (2) j, k, l, m, r, s, t, Chapter 8)
*1: Force/displacement-equipped
specification function

Table of Contents

Related product manuals