EasyManua.ls Logo

Architect i2000SR - Page 114

Architect i2000SR
212 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
i2000SR interface module Service Manual
Page 114 of 212 625798100.APS.5.doc
VERIFICATION
STEPS REFERENCES
8 Restore power to the workcell. Refer to the “Accelerator APS Operations Manual –
SECTION 5 – Operating Instructions” to execute
the “Restoring Power after a Controlled Shutdown”
of the Workcell.
9 Observe the screen for error
messages.
If no error message was displayed the procedure
has successfully completed.

Table of Contents