EasyManua.ls Logo

Architect i2000SR - Antennas test procedure

Architect i2000SR
212 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service Manual i2000SR interface module
625798100.APS.5.doc Page 187 of 212
Antennas test procedure
ALIGNMENT PROCEDURE SCHEDULE no. 18
Operation:
Test of antennas proper functioning
Working area: i2000SR IM Mechanical Group: 625.102.00X
Electrical Group: 625.800.00X Part no.
027.200.00X
027.100.00X
Machine Status: Operating in standalone mode
Skill Required: FSE (Field Service Engineer)
Time Required: TBD (To Be Determined)
Special Tools Required: None
Activity Type: Setting ; Control Cleaning Replacement
Intervention kind: ; Electrical Mechanical Fluidic Pneumatic
Daily Weekly Monthly
Quarterly Half yearly Yearly
Two-year After signalizing Because of failure
Frequency:
; When necessary

Table of Contents