EasyManua.ls Logo

Architect i2000SR - Replacement of belts 3 & 4 idler pulleys groups

Architect i2000SR
212 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service Manual i2000SR interface module
625798100.APS.5.doc Page 145 of 212
Replacement of belts 3 & 4 idler pulleys groups
REPLACEMENT PROCEDURE SCHEDULE no. 10
Operation:
Belts 3 & 4 idler pulleys groups
replacement
Working area: i2000SR IM Mechanical Group: 625.102.00X
Electrical Group: 625.800.00X Part no.
579.440.00X
579.450.00X
Machine Status: Controlled shutdown and power disconnected
Skill Required: FSE (Field Service Engineer)
Time Required: TBD (To Be Determined)
Special Tools Required: None
Activity Type: Setting Control Cleaning ; Replacement
Intervention kind: Electrical ; Mechanical Fluidic Pneumatic
Daily Weekly Monthly
Quarterly Half yearly Yearly
Two-year After signalizing ; Because of failure
Frequency:
When necessary
WARNING: Potential Biohazard. This is an activity or area
where you may be exposed to potentially infectious
material. Refer to “Section 4 - Hazards and Warnings
” of
the Accelerator Service Manual
Reduce exposure by using proper personal protection
equipment and cleaning surfaces with 0.1% sodium
hypochlorite (bleach).
CAUTION: Moving Parts
The safety cover protection is not guaranteed if the
security devices are removed or bypassed. Use caution to
prevent injury caused by moving parts.
WARNING: Electrical Shock Hazard. Possibility of electrical
shock exists if procedural or engineering controls are not
observed.
WARNING: Pinch hazard
CAUTION: Class 2 Laser Radiation when open. Do not stare
into beam. Avoid eye exposure to laser light.

Table of Contents