i2000SR interface module Service Manual
Page 144 of 212 625798100.APS.5.doc
VERIFICATION
STEPS REFERENCES
1 With the i2000SR IM in the APS
position, restore power to the
workcell.
Refer to the “Operations Manual – SECTION 5 –
Operating Instructions” to execute the “Restoring
Power after a Controlled Shutdown” of the
Workcell.
2 Check the APS screen for error
messages.
3 Perform the 3
i2000SR IM Horizontal
Positioning Check
4 Perform the
i2000SR IM Vertical
Positioning Check
5 Perform i2000SR IM Carrier
Movement Verification.
Verify that all Off-line and On-Line
carriers move properly
Ensure that all appropriate
Instruments are On-line
If no error messages or abnormal carrier
movements were noted, the procedure has
successfully completed.
6 Return APS operation to users.