Preventive Maintenance Procedures
This chapter provides the various system schedules and as needed
service maintenance procedures. Also included are references to
any required electrical and mechanical drawings.
Preventive maintenance procedures are to be performed at the
predefined intervals, which in turn will increase the reliability of
the system and reduce down time.
Lubrication of gears
ALIGNMENT PROCEDURE SCHEDULE no. 22
Operation:
Gears lubrication
Working area: i2000SR IM Mechanical Group: 625.102.00X
Electrical Group: 625.800.00X Part no.
579.420.00X
579.430.00X
Machine Status: Controlled shutdown and power disconnected
Skill Required: FSE (Field Service Engineer)
Time Required: TBD (To Be Determined)
Special Tools Required: None
Activity Type: Setting Control Cleaning Replacement
Intervention kind: Electrical ; Mechanical Fluidic Pneumatic
Daily Weekly Monthly
; Quarterly Half yearly Yearly
Two-year After signalizing Because of failure
Frequency:
When necessary