EasyManua.ls Logo

Architect i2000SR - Page 181

Architect i2000SR
212 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service Manual i2000SR interface module
625798100.APS.5.doc Page 181 of 212
STEPS REFERENCES
18 At the i2000SR feet, use the nut to
lock the feet.
VERIFICATION
STEPS REFERENCES
1 Perform a control run on any routine
and STAT assay.
2 Verify that probe enters the sample
tube in a manner that ensures that it
does not come in contact with the
side of the tube.
3 If no error messages occur and the
relationship between the probe is
centered on the tube, the procedure
has successfully completed.
4 Reinstall the removed covers.
5 Return APS operation to users.

Table of Contents