Service Manual i2000SR interface module
625798100.APS.5.doc Page 99 of 212
VERIFICATION
STEPS REFERENCES
1 With the i2000SR IM in the APS
position, restore power to the
workcell.
1. Turn i2000SR IM power switch
to APS position
2. Power on the Accelerator APS
UPS
No. Description
1 Bar Code Scanner beeps
once then twice.
2 Pole Instrument Indicator
Light turns RED
3 Tag Reader LEDs turn on
4 Pole RED lamp blinks until
the Master Slave to i2000SR
SCC communication check is
passed
1. SCC CLI Edgeport
port 1 (com 3)
2. Master Slave Port 2
(CLI)
3. SCC LAS Edgeport
port 4 (com 6)
4. Master Slave Port 1
(LAS)
NOTE:
The i2000SR IM will not initialize
unless the cable check is passed.
Refer to the “Accelerator APS Operations Manual –
SECTION 5 – Operating Instructions” to execute
the “Restoring Power after a Controlled Shutdown”
of the Workcell.
2 Check the APS screen for error
messages.
3 Perform the 3
i2000SR IM Horizontal
Positioning Check
4 Perform the
i2000SR IM Vertical
Positioning Check
5 Perform i2000SR IM Carrier
Movement Verification.
Verify that all Off-line and On-Line
carriers move properly
Ensure that all appropriate
Instruments are On-line
If no error messages or abnormal carrier
movements were noted, the procedure has
successfully completed.
6 Return APS operation to users.