EasyManuals Logo

Audi Q7 2007 Workshop Manual

Audi Q7 2007
228 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #179 background imageLoading...
Page #179 background image
Audi Q7 2007 !
6-cylinder TDI engine (3.0 ltr. 4-valve common rail), mechanics 01.2006
1 Removing and installing parts of cooling system
173
6
1.8 Removing and installing coolant pipe
(front)
Special tools and workshop equipment required
Hose clip pliers -V.A.G 1921-
Removing
Drain off coolant page 161.
Remove intake manifold (top section) Rep. Gr. 23.
Remove toothed belt for high-pressure pump page 48.
Remove high-pressure pump Rep. Gr. 23.
Disconnect coolant hose -arrow-.
Unscrew bolt -1- and pull coolant pipe (top) out of cylinder
block.
Installing
Installation is carried out in the reverse order; note the follow-
ing:
Renew O-ring.
Secure all hose connections with the correct type of hose
clips (same as original equipment) Parts catalogue.
Before installing, clean and smoothen sealing surface for
O-ring.
Lubricate new O-ring with “G12+” and slide onto coolant
pipe.
Install high-pressure pump Rep. Gr. 23.
Install toothed belt for high-pressure pump page 48.
Install intake manifold (top section) Rep. Gr. 23.
Fill cooling system page 162.
Tightening torque
Component Nm
Front coolant pipe to oil cooler 9
Note
更多资料请访问深度汽车论坛 http://shenduauto.com/ 客服QQ:1398556747 电话:18218750259

Table of Contents

Other manuals for Audi Q7 2007

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Audi Q7 2007 and is the answer not in the manual?

Audi Q7 2007 Specifications

General IconGeneral
BrandAudi
ModelQ7 2007
CategoryAutomobile
LanguageEnglish

Related product manuals