Audi Q7 2007 !
6-cylinder TDI engine (3.0 ltr. 4-valve common rail), mechanics 01.2006
2 Servicing work on timing chain end
85
6
2.12 Removing and installing drive chain for oil pump and balance shaft
Special tools and workshop
equipment required
♦ Locking pin -3242-
♦ Diesel injection pump
locking pin -3359-
♦ Adapter -T40049-
♦ Drill bit, ∅ 3.3 mm
Removing
– Remove timing chain covers ⇒ page 59.
– Attach adapter -T40049- at rear end of crankshaft using
two old securing bolts for drive plate.
Ignore -arrow-.
Note
更多资料请访问深度汽车论坛 http://shenduauto.com/ 客服QQ:1398556747 电话:18218750259